The Alinta Fortescue Solar Gas Hybrid Project will be developed, owned and operated by Alinta. The facility consists of 60 MW AC solar PV integrated with a 35 MW battery storage facility at the Newman gas-fired power station in the Pilbara region of WA.
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
Project Lead: Alinta Energy
Address: Pilbara Pilbara Western Australia Australia