The Coober Pedy Renewable Diesel Hybrid project will install 1MW solar, 4MW wind generation, a 1MW, 0.5MWh battery storage and inverter system as well as a range of additional proven technologies, integrated with Energy Developments Ltd’s (EDL) existing 3.9MW diesel power station in Coober Pedy.
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
Project Lead: Energy Developments
Address: Potch Gully Rd Coober Pedy South Australia 5723 Australia