The project involves the design, build and operation of a 1.5 tonne/hour pre-commercial demonstration energy-from-waste (EfW) plant located in the Shire of Collie in Western Australia.
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
Project Lead: Renergi
Address: Coalfields Highway Collie Western Australia 6225 Australia